KVK Corporation
KVK Corporation
KVK Corporation KVK Corporation
KVK Corporation KVK Corporation KVK Corporation KVK Corporation KVK Corporation KVK Corporation
KVK Corporation KVK Corporation
KVK Corporation
KVK Corporation
KVK Corporation
KVK Corporation
KVK Corporation
KVK Corporation
KVK Corporation
KVK Corporation


nitrogen gas plant

nitrogen gas generator

nitrogen gas producing plant

nitrogen production plant

nitrogen production

KVK Corporation KVK Corporation

NITROGEN GAS PLANT


KVK Corporation
 


Product Data in reference to 100 M3/Hr capacity plant.Nitrogen gas plant can produce basically Oxygen and nitrogen gas generator. However, the nirogent producing plant can be controlled to nitrogen produce these products in different standard modes as given below, based on standard operating conditions:-

Production Cycle -I
Oxygen-gaseous-dry-99.5 % and above purity-100 M3/Hr. Nitrogen-gaseous-96-98 % purity -waste product.

Production Cycle -II
Oxygen-gaseous-dry-99.5 % and above purity-93 M3/Hr. Nitrogen-gaseous-99.6 to 99.8 % purity-125 M3/Hr. (Nitrogen Compressor required for filling this Nitrogen into Cylinders- at extra cost.)

Production Cycle -III
Oxygen-gaseous-dry-99.5 % and above purity-93 M3/Hr. Nitrogen liquid 15 to 18 Ltrs. Per hour purity 99.9 %

Production Cycle -IV
Oxygen-gaseous-dry-99.5 % and above purity-70 M3/Hr. Nitrogen gaseous dry-Less than 10 PPM purity = M3/Hr. Nitrogen gaseous dry-Less than 10 PPM purity = M3/Hr.



Technical Specification
Technical Data
Specifications 130 M3/Hr. 170 M3/Hr. 200 M3 / Hr.
Air Compressor Capacity 740 M3/Hr. 950 M3/Hr. 1150 M3/Hr.
Starting Pressure 40 Kg/cm2 40 Kg/cm2 40 Kg/cm2
Operating Pressure 30-35 kg/cm2 30-35 kg/cm2 30-35 kg/cm2
Starting time till production 7 Hrs. 7 Hrs. 7 Hrs.
Defrosting time 4/6 Hrs. 4/6 Hrs. 4/6 Hrs.
Defrosting cycle at normal condition 12 months 12 months 12 months
Power supply required 420V 220V 3Phase 50 Hz 420V 220V 3Phase 50 Hz 420V 220V 3Phase 50 Hz
Rate through put of liquid Oxygen Pump 130 M3/Hr. 170 M3/Hr. 200 M3/Hr.
Delivery Pressure of pump 165 kg/cm2 165 kg/cm2 165 kg/cm2
Cylinder filling manifold 2 X 12 2 X 20 2 X 20
Cooling water requirement 40 M3/Hr. (Re-circulated) 50 M3/Hr. (Re-circulated) 70 M3/Hr. (Re-circulated)
Make-up water requirement Approx. 0.5 M3/Hr. Approx. 0.5 M3/Hr. Approx. 1 M3/Hr.
Max. Individual item weight 8.5 Tons 10 Tons 11 Tons
Gross Weight 20 Tons (approx.) 32 Tons (approx.) 40 Tons (approx.)
Insulation Perlite. Perlite. Perlite.
Assembly Height 8.0 meters 9.2 meters 9.2 meters
Area required 200 sq.mtrs. 250 sq.mtrs. 350 sq.mtrs.
Material of construction Copper, Brass, Steel etc Copper, Brass, Steel etc Copper, Brass, Steel etc
Power consumption 1.2 units/M3 of Oxygen 1.0 units/M3 of Oxygen 1.0 units/M3 of Oxygen


Oxygen Gas Plant Nitrogen Gas Plant Acetylene Gas Plant
Nitrous Oxide Gas Plant Hydrostatic Cylinder Test Station Expansion Engine
Cylinder Safety Posters


KVK Corporation
KVK Corporation


Looking for Product Name ?